কনটেন্টটি শেষ হাল-নাগাদ করা হয়েছে: মঙ্গলবার, ১০ ফেব্রুয়ারী, ২০২৬ এ ০২:৫৯ PM

নেট মিটারিং প্রোগ্রামের জন্য সৌর যন্ত্রাংশের নির্বাচিত স্ট্যান্ডার্ডসমূহ

কন্টেন্ট: পাতা

SLProduct NameApplicable BDS Standard(s)Equivalent IEC Standard(s)
1. Solar Module/Panel

BDS IEC 61215-1:2022

Terrestrial photovoltaic (PV) modules-Design qualification and type approval Part 1 Test requirements.

IEC 61215-1:2021

Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1: Test requirements

BDS IEC 61215-2:2022

Terrestrial photovoltaic (PV) modules-Design qualification and type approval Part 2: Test procedures.

IEC 61215-2:2021

Terrestrial photovoltaic (PV) modules-Design qualification and type approval Part 2: Test procedures.

BDS IEC 61730-1 :2024

Photovoltaic (PV) module safety qualification – Part 1: Requirements for construction.

IEC 61730-1:2023

Photovoltaic (PV) module safety qualification – Part 1: Requirements for construction.

BDS IEC 61730-2:2024

Photovoltaic (PV) module safety qualification – Part 2: Requirements for testing.

IEC 61730-2:2023

Photovoltaic (PV) module safety qualification – Part 2: Requirements for testing.

2.

Inverter

(Single-Phase/Three- Phase)

BDS IEC 62109-1:2016

Safety of power converters for use in photovoltaic power systems Part 1: General requirements.

IEC 62109-1:2010

Safety of power converters for use in photovoltaic power systems Part 1: General requirements.

BDS IEC 62109-2:2016

Safety of power converters for use in photovoltaic power systems Part 2: Particular requirements for inverters

IEC 62109-2:2011

Safety of power converters for use in photovoltaic power systems Part 2: Particular requirements for inverters.

BDS IEC 61727:2020

Photovoltaic (PV) systems – Characteristics of the utility interface

IEC 61727:2004

Photovoltaic (PV) systems – Characteristics of the utility interface.

BDS IEC 62116:2020

Utility-interconnected photovoltaic inverters – Test procedure of islanding prevention measures

IEC 62116:2014

Utility-interconnected photovoltaic inverters – Test procedure of islanding prevention measures.

**The standards can be sourced from https://ec.eservice.bsti.gov.bd/bds-search?type=all

এক্সেসিবিলিটি

স্ক্রিন রিডার ডাউনলোড করুন